§ 13.04. Installation.  


Latest version.
  • All manufactured/mobile homes shall be installed according to all the requirements of the Standard Building Code, 1994, Appendix H, or as same may be amended; and, these shall be completely skirted, with a weather resistant material within thirty (30) days from the date the home is moved into the park. Such weather resistant material(s), as chosen by the owner or contractor, should be painted or coated with some kind of outdoor water resistant paint or primer. The choice of color(s) should blend with the color-scheme of the manufactured (mobile) home. Any loud or severely contrasting color should be avoided to eliminate the possibility of creating an eye sore. Earth tones and neutral colors are often good choices that lend harmony. All skirting shall be adequately vented.